UPS – PLC Upgrade and Conveyor Electrical Installation
Location: Lathrop, CA
Client: UPS
Agency:
Time Period: 07/2016 – 11/2016
Construction Cost:
Contract Amount: $1.94M
Project Description
UPS’s Lathrop Hub is a 748,000 sq ft Distribution Facility near Stockton, CA which sorts and ships hundreds of thousands of packages each day.In 2015 and 2016, the facility was increasing output and needed to expand capacity. Therefore, additional conveyor lines were needed to keep up with the rising demand.
Our Role
Johnson-Peltier was contracted to install the entire Electrical, Instrumentation and Communication Package.
Johnson-Peltier installed: (6) New 480V Motor Feeders, Inch Pulse Tracking Signals, Tip Tray Sensors, (13) Thirteen E-Stop Switches, All associated Conduit, Cable & Wire
Awards
2017 Project Excellence Award – National Electrical Contractor Association – Los Angeles Chapter