Electrify America EV Charging Station
Location: Castro Valley, CA
Client: Electrify America
Agency:
General Contractor: Black & Veatch
Time Period: 03/2019
Construction Cost:
Contract Amount:
Project Description
Bank of America contracted Black & Veatch to Design/Build several EV Charging Stations at various Branch Locations throughout California.
Our Role
Johnson-Peltier was contracted to provide all Power, Controls & Communication Systems for the Project.
Johnson-Peltier installed: PG&E New Feeder, New Meter, New Transformer, New 480v Switchgear, New Panelboards, New Disconnects, (4) Charging Pedestals (8 Ports), Conduit/Wire/Cable, Concrete Encased Underground Duct Banks, Striping & Signage