Due to increased demand, CRC elected to increase capacity at the Huntington Beach storage facility located along Pacific Coast Highway.
Our Role
Johnson-Peltier was contracted to relocate electrical infrastructure as well as the installation of new electrical infrastructure, which includes, trenching, conduit installation, manhole installation, grounding, civil and structural work associated, as well as, conduit inspection, ground checks, city inspection, and backfill as specified.
Johnson-Peltier installed: Cable Tray & Cable, Conduit & Cable, Pull boxes