Location: Colton, CA

Client: Colton Electric Utility

Agency: Alliance Century

General Contractor: Black & Veatch

Time Period: 2012

Construction Cost:

Contract Amount:

Project Description

Colton Power is an electric utility in the City of Colton, CA providing peak power support to the local grid.This project was designed to meet California peak power demands in a reliable and environmentally responsible manner.  The two Colton Power Facilities, Century and Drews, are located on leased property within existing City of Colton substations.

Our Role

Johnson-Peltier Electrical, with the help of several subcontractors, installed eight (8) General Electric 10-Megawatt Combustion Turbine Generation units, for the City of Colton. Black & Veatch engineered and managed the overall project for Alliance Century Project and the City of Colton. The turbines were installed at two sites in the City of Colton, California simultaneously, four (4) at the Drews site and four (4) at the Century site.

 Century Project: A 40-megawatt simple cycle project consisting of four, 10-megawatt, gas turbine generators. The project, by Alliance Colton LLC, is located in the City of Colton at the existing Century Substation in San Bernardino County. The facility is part of the Independent System Operator’s reliability generation agreement.

Drews Project: A 40-megawatt, simple cycle project consisting of four, 10 megawatt, gas turbine generators. The project, by Alliance Colton LLC, is built in the City of Colton at the existing Drews Substation in San Bernardino County. The facility is part of the Independent System Operator’s reliability generation agreement.

Johnson-Peltier installed:

Century Site

  • (4) General Electric 10-Megawatt Combustion Turbine Generation Units including all associated electrical and instrumentation for the Turbine, Generator, lube oil, air intake, and all other associated systems.
  • All Fiber Optic, Ethernet, and Category 5 communications systems.
  • Electrical control enclosure, housing (4) Turbine control panels, (4) 480VAC Motor control centers, (1) DC motor control panel, 24VDC Battery system, 125VDC Battery system, and Balance of Plant Computer.
  • 15kV Generator Switchgear.
  • TRENWA concrete trench system between the Generators and the 15kV Switchgear incorporating a “rock dust” medium for heat dissipation.
  • Installation of TRENWA concrete trench for all mechanical piping.
  • 15kV cable between the generators, 15kV Switchgear, and the existing substation Switchgear.
  • Installation of (3) new steel 80’ power poles.
  • Relocation of approximately 1500’of 69kV power transmission lines from existing wood poles to the new steel poles and removal of existing wood poles.
  • (1) 69kV / 15kV Station transformer.
  • (1) 69kV gas filled circuit breaker.
  • (1) 69kV disconnect switch.
  • 69kV cable bus addition between the station transformer, circuit breaker and the existing substation.
  • (2) 15kV / 480V auxiliary transformers.
  • (1) 15kV / 4160V auxiliary transformer.
  • (1) 15kV Disconnect switch.
  • (1) 15kV metering section.
  • (1) Fuel gas compression unit with twin 4160V 600hp compressors including all electrical and instrumentation.
  • (2) Instrument air Compressors including all electrical and instrumentation.
  • (1) Ammonia storage tank including associated electrical and mechanical piping.
  • (4) Ammonia vaporization skids including associated electrical, instrumentation and mechanical piping.
  • (4) Quench air skids including associated electrical, instrumentation and mechanical piping.
  • (4) CEMS emissions sampling units including all electrical, instrumentation and mechanical piping.

Drews Site

  • (4) General Electric 10-Megawatt Combustion Turbine Generation Units including all associated electrical and instrumentation for the Turbine, Generator, lube oil, air intake, and all other associated systems.
  • All Fiber Optic, Ethernet, and Category 5 communications systems.
  • Electrical control enclosure, housing (4) Turbine control panels, (4) 480VAC Motor control centers, (1) DC motor control panel, 24VDC Battery system, 125VDC Battery system, and Balance of Plant Computer.
  • 15kV Generator Switchgear.
  • TRENWA concrete trench system between the Generators, 15kV Switchgear, and the existing substation control room incorporating a “rock dust” medium for heat dissipation.
  • 15kV cable between the generators, 15kV Switchgear, and the existing substation Switchgear.
  • (2) 15kV / 480V auxiliary transformers.
  • (1) 15kV metering section.
  • (1) Fuel gas compression unit with twin 480V 400hp compressors including all electrical and instrumentation.
  • (2) Instrument air Compressors including all electrical and instrumentation.
  • (1) Ammonia storage tank including associated electrical, instrumentation and mechanical piping.
  • (4) Ammonia vaporization skids including associated electrical, instrumentation and mechanical piping.
  • (4) Quench air skids including associated electrical, instrumentation and mechanical piping.
  • (4) CEMS emissions sampling units including all electrical, instrumentation and mechanical piping.
  • Installation of the SCR stacks and all associated electrical, instrumentation and mechanical piping.
  • Civil work for all equipment subcontracted and supervised by Johnson-Peltier
  • SCR stack erection and Catalyst installation subcontracted and supervised by Johnson-Peltier.