FROM FRIENDS TO INDUSTRY LEADERS.
Founded In 1957: Friends Woody Johnson and Howard Peltier formed Johnson-Peltier Inc., under California State License No. 168893. Johnson-Peltier started out modestly as a one-truck operation where Woody took care of the sales and inside business management while Howard managed the field work. By completing projects on time and on budget backed by consistent quality work, Johnson-Peltier developed a strong reputation in the industrial community as a reliable and honest electrical services company.
KEY TECHNICAL SKILLS
Johnson-Peltier specializes in all phases of electrical construction including:

SECTORS WE SERVICE
OIL & GAS
FOOD & BEVERAGE
ENERGY
AEROSPACE
UTILITY
MANUFACTURING
WHAT WE DO BETTER THAN THE REST.
Specializing in Heavy Industrial Electrical: medium & low voltage line work, control systems, instrumentation and communication integration.
POWER INSTALLATIONS
Substations • Switchgear • Underground Systems • Transformers • Power Plants • Green Energy Solutions • UPS Systems • Co-Generation
POWER DISTRIBUTION
Medium & Low Voltage • Conduit • Underground Duct Bank • Cable Tray • Cable & Wire
CONTROLS
Programmable Logic • Automation • Motor Control Centers
INSTRUMENTATION
Pneumatic / Electronic & Specialized Services • Cathodic Protection • Heat Trace • Odorant Injection • Fire & Gas Detection • Metering • Methane Detection • Gas Compressors • Trim Coolers • Chillers • plus more
COMMUNICATIONS
LAN Systems • Fiber Optics • Lighting Controls • Data Control Centers
LIGHTING
High Bay • General • Industrial • Commercial • Class 1 Div 1 – Specialty
DESIGN & ENGINEERING
Turn-Key Power • Distribution Modifications • Upgrades
SIX DECADES ON TIME.
Johnson-Peltier has the resources and experience to complete projects on time and within budget regardless of the size or complexity. Furthermore, in the 65 years Johnson-Peltier has been operational we have never missed a deadline. From pre-construction to post-completion, Johnson-Peltier’s highest priority is customer satisfaction.
- Disney – Decorative Rim Light ReplacementJohnny Muller2023-02-28T18:22:52+00:00
Disney – Decorative Rim Light Replacement
- Colton Electric Utility – 80MW GeneratorsJohnny Muller2023-02-28T18:16:40+00:00
Colton Electric Utility – 80MW Generators
- Miller B3-B4 Line ConsolidationJohnny Muller2023-02-28T18:07:22+00:00
Miller B3-B4 Line Consolidation
- SoCalGas Microturbine GenerationJohnny Muller2023-02-28T18:01:32+00:00
SoCalGas Microturbine Generation
- Plains-All-American – Oil BlendingJohnny Muller2023-03-06T17:15:46+00:00
Plains-All-American – Oil Blending
- PG&E – Topock Compressor Station – Class I Div I LightingJohnny Muller2023-02-28T17:15:19+00:00
PG&E – Topock Compressor Station – Class I Div I Lighting
- POLA – Badger Bridge Rehabilitation ProjectJohnny Muller2023-02-28T17:10:43+00:00
POLA – Badger Bridge Rehabilitation Project
- CRC – 12kV Electrical RelocationJohnny Muller2023-03-06T17:06:11+00:00
CRC – 12kV Electrical Relocation
- FirstElement Fuel – Hydrogen Fueling StationJohnny Muller2023-02-28T16:57:33+00:00
FirstElement Fuel – Hydrogen Fueling Station
- UPS – PLC Upgrade and Conveyor Electrical InstallationJohnny Muller2023-02-28T16:50:53+00:00
UPS – PLC Upgrade and Conveyor Electrical Installation
- Chevron – Substation #15 UpgradeJohnny Muller2023-02-28T16:40:50+00:00
Chevron – Substation #15 Upgrade
- Eastwood Recycled Water Pump Station ProjectJohnny Muller2023-02-28T16:33:23+00:00
Eastwood Recycled Water Pump Station Project
- SoCalGas – SB 1383 Dairy Biomethane InterconnectJohnny Muller2023-02-28T16:24:06+00:00
SoCalGas – SB 1383 Dairy Biomethane Interconnect
- The Mars Curiosity Project – Airborne Toxic Control Measures (ATCM) Power Task & G86 Power DistributionJohnny Muller2023-02-27T23:40:07+00:00
The Mars Curiosity Project – Airborne Toxic Control Measures (ATCM) Power Task & G86 Power Distribution
- Tesoro – Wilmington Substation #4 ReplacementJohnny Muller2023-02-27T23:26:52+00:00
Tesoro – Wilmington Substation #4 Replacement
- Farmer-John Bacon Slice Lines 1-3Johnny Muller2023-02-27T23:18:48+00:00
Farmer-John Bacon Slice Lines 1-3
- Port of Long Beach – Gerald Desmond Bridge ReplacementJohnny Muller2023-02-27T23:14:27+00:00
Port of Long Beach – Gerald Desmond Bridge Replacement
- Blythe Compressor Station Plant 4Johnny Muller2023-02-27T23:08:13+00:00
Blythe Compressor Station Plant 4
- Chevron – Coker Cold Line Feed UpgradeJohnny Muller2023-02-27T23:08:49+00:00
Chevron – Coker Cold Line Feed Upgrade
- MillerCoors – Fermenter Tank LightingJohnny Muller2023-02-27T22:42:34+00:00
MillerCoors – Fermenter Tank Lighting
- FirstElement Fuel – Hydrogen Fueling StationJohnny Muller2023-02-27T22:37:35+00:00
FirstElement Fuel – Hydrogen Fueling Station
- Disney 5kV-12kV Site Wide Cable UpgradeJohnny Muller2023-02-27T22:25:03+00:00
Disney 5kV-12kV Site Wide Cable Upgrade
- Pipeline Safety Enhancement Program (PSEP)Johnny Muller2023-02-27T22:24:24+00:00
Pipeline Safety Enhancement Program (PSEP)
- Electrify America EV Charging StationJohnny Muller2023-02-27T22:24:43+00:00
Electrify America EV Charging Station
PLAN TO SUCCEED.
From owner conception to construction finish, Johnson-Peltier’s highly-accredited team offers a wide range of skill and knowledge, from design assistance to construction feasibility and cost savings. We can aid in avoiding potential traps and delays during the early stages of a project, and we are experts at fast track construction, saving critical time over conventional bidding by allowing construction to begin before final design is complete.
THE POWER TO BE YOUR BEST.
Our team is ready to power yours, let’s discuss your electrical needs today.